Shilshole 11Jun21 *
SG235 *
Dive index
* Mission links
Based on high voltage usage over previous 4 dives:
dives remaining : 51 (2.2 days at current dive duration)
projected end date: 14-Jun-2021 00:11:26 (to 15% capacity)
Based on high voltage usage over previous 4 dives:
dives remaining : 51 (2.2 days at current dive duration)
projected end date: 14-Jun-2021 00:11:26 (to 15% capacity)
Based on fuel gauge from combined packs over previous 4 dives:
dives remaining : 414 (17.5 days at current dive duration)
projected end date: 29-Jun-2021 09:00:22 (to 15% capacity)
High voltage pack usage
Low voltage pack usage